AI comparisons Round 5: Can AI handle a complex cargo claim?

As our ‘De-mystifying digitalisation and AI in maritime campaign’ has progressed, we’ve been making the questions we put to the leading large language models increasingly difficult. This month we have given the models a cargo claim, having them respond to the following scenario: You are a claims handler for Split Seas Container Lines reviewing a cargo claim. (The relevant documents are attached.) Assess the claim and provide your views on liability, any further investigations required, missing documentation, potential defences, and any applicable limitations. 

We have invited Amanda Hastings, Head of Claims – Asia for Maersk, to be our expert guest judge. Note – in previous rounds, members of the Intent team have co-scored AI outputs for accuracy. However, this month we are not scoring the outputs, as we are not qualified to score the accuracy of the AI outputs relating to legal matters. 

The results will be shared in the next edition of our monthly newsletter, so do sign up to learn who the winner is. We will include the link to the results at the bottom of this page once they are out.

Take a look at the outputs below and see whether any stand out to you. We’ll be carrying out our assessment before sharing our results at the end of the month. 

Below, you will find the outputs from the public versions of five leading AI platforms – ChatGPT, Claude, Copilot, Gemini and Grok, but these have been shuffled and anonymised to prevent any biases.

———————————– 

OUTPUTS

———————————-

LL1

The claim should not presently be admitted. The Carrier has substantial defences on standing, breach, causation, quantum, inherent vice, disease, and shipper stowage. However, outright rejection would be premature until the cause and chronology of the delay, ventilation performance, and condition of the cargo before loading are properly established.

My provisional assessment is:

Issue Present view
Claimant’s standing Not established
Carrier breach Not established; possible residual exposure
Causation Strongly disputed and probably multifactorial
Temperature management Generally favourable to Carrier, with evidential gaps
Claimed quantum Unsupported and internally inconsistent
Weather defence Potentially strong, but chronology must be proved
Hague-Visby limitation Probably far above the USD 50,400 claim
Time bar Likely 13 July 2027, subject to full terms and procedural requirements
Recommended reserve USD 15,000-25,000 plus costs, pending investigation

Contract and applicable regime

The contract is the non-negotiable sea waybill SS250623, subject to English law and LMAA arbitration in London. The extract also purports to incorporate the Carrier’s standard bill of lading terms and the Hague-Visby Rules.

The precise legal application of Hague-Visby needs care because this is a sea waybill, not a bill of lading. The Rules may apply contractually, and may also apply compulsorily if the underlying contract was “covered by” a bill of lading in the relevant legal sense. English authority confirms that Hague-Visby can apply where a sea waybill was issued but the shipper was contractually entitled to demand a bill of lading. steamshipmutual.com rpclegal.com

The complete standard terms are essential. The available extract does not identify:

  • the Carrier’s contractual period of responsibility;
  • the full delay, weather, congestion and route-deviation clauses;
  • any special reefer or perishable-cargo provisions;
  • any notice provisions;
  • any delay-specific financial cap;
  • Himalaya and subcontracting clauses;
  • whether Hague-Visby applies only tackle-to-tackle or contractually throughout CY/CY carriage; or
  • whether the standard terms distinguish delay from physical cargo damage.

The waybill’s “Hague-Visby” clause followed by the heading “Incorporation of the Hague Rules” is also ambiguous and should be checked against the executed document.

Standing and title to sue

This is the first threshold issue. A-Peeling Traders FZE is not named anywhere on the sea waybill. The named shipper is Gran Racimo Plantations and the consignee is We Love Bananas. The survey was instructed by We Love Bananas, while A-Peeling says it writes “on behalf of our principals” without identifying those principals or proving authority.

Under section 2 of the Carriage of Goods by Sea Act 1992, rights under a sea waybill generally vest in the person to whom delivery is to be made under the contract, here apparently We Love Bananas, unless A-Peeling can establish its own contractual rights, a valid assignment, or authority to prosecute the claim for the entitled party. legislation.gov.uk

Require:

  • purchase and resale contracts;
  • commercial invoices;
  • proof of payment;
  • evidence of who owned or bore the risk in the bananas when damage occurred;
  • any assignment from We Love Bananas or Gran Racimo;
  • written authority from the alleged principal;
  • evidence that A-Peeling itself suffered the claimed loss; and
  • insurance documents and any subrogation receipt.

Until supplied, the Carrier should reserve the right to deny that A-Peeling has title to sue.

Was the Carrier in breach?

Delay alone

The relevant contractual arrival dates were expressly estimates, not guarantees. Both the waybill and booking documents state that arrival, departure and transit times were indicative and subject to change. The booking confirmation also says the Carrier accepts no liability for delay.

There was no fixed contractual delivery date on the documents provided. The original feeder ETA was 7 July, but the amendment of 10 June gave a revised ETA of 10 July. Actual discharge on 13 July was therefore:

  • six days after the original 7 July feeder ETA;
  • three days after the revised 10 July ETA; and
  • within three days of the upper end of the alleged 7-10 July window.

The letter of claim’s assertion of a 6-10 day delay is therefore not supported. Nor is the surveyor’s reference to an “apparent delay of approximately 10 days.” Against the revised booking, the apparent slippage is only three days.

The Hague and Hague-Visby Rules do not themselves create a general delivery-time warranty. Contractual liability for delay therefore depends heavily on the waybill terms and ordinary English contractual principles. swedishclub.com

The estimated-time exclusions materially assist the Carrier, but they should not be treated as automatically conclusive. Depending on the full terms and facts, they may not protect:

  • unreasonable or culpable delay;
  • failure to care properly for the cargo during a prolonged transit;
  • departure from an agreed reefer specification;
  • failure to exercise reasonable dispatch; or
  • a breach causing physical deterioration rather than pure economic loss from lateness.

Care of the bananas

The Claimant will argue that this is not merely a claim for late delivery: the extended carriage allegedly caused physical deterioration. The Carrier therefore needs to show that it properly and carefully carried, kept and cared for the bananas throughout its period of responsibility.

The present reefer evidence is helpful:

  • 22 containers recorded no temperature deviation from the 13.3°C set point.
  • The one recorded off-power event occurred after discharge.
  • All containers were externally sound.
  • No in-transit machinery failure is identified.
  • Survey temperatures of 13.7°C to 23.3°C were accepted by both surveyors as consistent with post-discharge warming.

But “return-air temperature at set point” does not necessarily prove that every part of the cargo remained properly cooled. Blocked T-bar channels, ventilation failures, poor stuffing, excessive pre-carriage pulp temperature, respiration heat, or airflow short-circuiting could produce local deterioration without a machinery set-point alarm.

The Carrier should therefore avoid asserting that the logger summary conclusively proves absence of any cooling problem.

Weather and congestion

Tropical Storm Gustav is a potentially strong explanation and defence, but the present evidence is incomplete.

The storm affected Puerto Banana between approximately 25 and 29 June, caused terminal suspension, and left a backlog of about 45 vessels. That could engage contractual weather and congestion exclusions and, depending on the facts, Hague-Visby defences for perils or dangers of the sea or other cause arising without the Carrier’s actual fault or privity.

There is, however, an important chronological problem. The revised feeder was due to depart Puerto Banana on 3 July, after limited operations resumed and after full berthing operations were expected to resume on 30 June. The Carrier must explain:

  1. when each container arrived at Puerto Banana;
  2. why it did not move on the intended mainline or feeder connection;
  3. whether a connection was missed before the storm;
  4. how the storm backlog affected this specific shipment;
  5. when MV PLANTAIN RUNNER actually berthed and sailed;
  6. whether another reasonable connection was available; and
  7. what steps were taken to prioritise or protect this time-sensitive cargo.

The customer advisory refers partly to Eastern Mediterranean services and Port Muzhaven, whereas this cargo was destined for Rotterdam. It is general background evidence, not proof that the storm caused this shipment’s delay.

A weather defence will be materially weakened if the operative delay was caused by poor scheduling, overbooking, an avoidable missed connection, vessel omission, or failure to act reasonably after operations resumed.

Causation

Causation is presently the Carrier’s strongest substantive defence.

Natural ripening and inherent characteristics

Cavendish bananas are inherently perishable. The Claimant’s own surveyor gives a shelf-life range of 35-40 days from harvest, but the documents do not establish the harvest date. They only establish loading on 6 June. If the bananas were harvested several days before loading, their age at discharge may have been materially greater than 38 days.

Nor has the Claimant established that 35-40 days is a fixed or recognised limit applicable to these bananas under:

  • this maturity grade;
  • the particular plantation and season;
  • Banavac packaging;
  • ordinary atmosphere rather than controlled atmosphere;
  • the specified ventilation;
  • the intended ripening programme; or
  • the cargo’s initial pulp temperature.

Natural ripening, inherent vice, and insufficiency of shelf life for the contemplated voyage are credible defences. But the Carrier must show that it could not, through reasonable care under the agreed carriage conditions, have prevented the relevant deterioration. Merely describing bananas as perishable will not answer a proved case of culpable delay.

Pre-existing disease

Anthracnose and finger rot generally point toward plantation, harvesting, packing, or pre-shipment conditions rather than a sea-carriage temperature excursion. This supports:

  • inherent vice;
  • latent defect or pre-existing condition;
  • insufficiency of packing or preparation; and
  • causation unrelated to Carrier fault.

An independent banana pathologist should assess whether the diseases were necessarily pre-shipment in origin and whether prolonged transit merely revealed or aggravated them.

Shipper’s stowage

The waybill records shipper’s load, stow, weight and count. The Carrier’s surveyor observed non-perforated plastic sheets obstructing door-side T-bar floor channels in several containers. If proven, this is significant evidence of insufficient or improper stowage and airflow obstruction.

It may support Hague-Visby defences relating to the act or default of the shipper and insufficiency of packing. It may also establish contributory causation or failure to mitigate.

Further proof is needed because the report does not identify:

  • each affected container;
  • photographs of the sheeting;
  • the extent of obstruction;
  • whether the loading method was normal industry practice;
  • whether Carrier personnel saw or approved it;
  • whether ripening was worse in affected containers; or
  • whether the claimed 14 containers correspond to those with obstructed airflow.

The failure to correlate stowage defects with damage patterns is currently a weakness.

Lack of correlation with alleged delay

The evidence does not presently demonstrate that a three-day delay beyond the revised ETA caused a USD 3-per-box depreciation. The cargo was already on a voyage planned to take it close to its asserted shelf-life limit. The Claimant knowingly shipped without controlled atmosphere or humidity control.

An expert needs to distinguish among:

  • normal age-related reduction in remaining shelf life;
  • physical damage caused by additional transit days;
  • disease-related deterioration;
  • airflow-related local damage;
  • post-discharge warming;
  • delayed survey or unpacking; and
  • downstream commercial discounting unrelated to actual physical condition.

Survey evidence

The Claimant’s survey is materially deficient.

It says all containers showed advanced deterioration and that 35-40% of fruit was beginning to ripen, but its joint tally records only approximately 45 yellow/damaged boxes and three total-loss boxes out of 27,600. Those figures represent only about 0.17% of the shipment, not 35-40%.

The report then applies USD 3 depreciation to every box without:

  • container-by-container sampling records;
  • sample sizes;
  • ripening colour-stage records;
  • photographs;
  • agreed joint minutes;
  • evidence of final sales;
  • evidence of rejected boxes; or
  • explanation of how 45 visibly affected boxes justify depreciation of all 27,600 boxes.

The Carrier’s report also contains inconsistencies. It records only 20 yellow boxes and one total loss, but later states “damage extent: approximately 17%” and “liability: Carrier and Shipper (shared)” while assessing the Carrier’s financial contribution at zero. The surveyor should clarify those statements before the report is relied upon in arbitration.

The seals had been removed before either surveyor attended. Chain of custody, condition at seal removal, and any intervening handling are therefore unverified.

There was also a four-day interval between discharge and survey. During that period bananas may have warmed, been moved, opened, ventilated, exposed to ethylene, or partly ripened. The Claimant must prove where and how each container was stored during this interval.

Quantum

The USD 50,400 claim is not substantiated.

Arithmetical and scope inconsistencies

The waybill and surveys refer to 23 containers and 27,600 boxes, but the claim schedule includes only 14 containers and 16,800 boxes. The listed container numbers, SPCU0001 to SPCU0014, do not match the container numbers in the logger report or the specifically affected SPCU8230652.

The surveyor purportedly valued depreciation across the full shipment:

27,600×$3.00=$82,800

27,600×$3.00=$82,800

The claim instead seeks:

16,800×$3.00=$50,400

16,800×$3.00=$50,400

No explanation is given for why only 14 containers are claimed, which actual containers they represent, or whether they were the containers showing airflow obstruction, disease, or missing logger data.

There are also inconsistencies in the claim letter:

  • it is headed 4 November 2026;
  • it is signed and dated 10 September 2026; and
  • it states that the contractual time bar expires on 1 July 2027, without explanation.

Measure of loss

For physical cargo damage, the usual starting point is the difference between sound arrived market value and actual arrived value, with appropriate credit for salvage and mitigation. The Claimant has supplied only asserted figures of USD 19.75 and USD 16.75 per box.

Require:

  • supplier and resale invoices;
  • Rotterdam market evidence at the date and place of delivery;
  • actual sales invoices and credit notes;
  • inspection, sorting and ripening records;
  • salvage tenders and sale proceeds;
  • evidence of extra handling, disposal or reconditioning costs;
  • exchange-rate support;
  • evidence that discounts were caused by the alleged damage;
  • proof that the claimant, rather than the consignee, suffered the difference; and
  • confirmation whether the stated values include freight, duty, commissions or profit.

A general reduction in “remaining shelf life” is not automatically recoverable at USD 3 per box. Actual market depreciation must be proved.

Potential defences

Subject to the full terms and evidence, the Carrier should preserve the following defences:

  1. No title to sue: A-Peeling is not shipper or consignee and has not proved assignment, authority, ownership, risk, or loss.
  2. No guaranteed ETA: All dates were expressly estimates and the revised ETA was 10 July, making the apparent slippage three days.
  3. Contractual exclusion of delay liability: Subject to enforceability, construction, and Hague-Visby Article III rule 8 where applicable.
  4. Adverse weather and port congestion: Provided causation and reasonable Carrier response are demonstrated.
  5. No breach of reefer obligation: Set point was maintained in 22 containers, with no established machinery failure.
  6. Inherent vice or natural ripening: The cargo was shipped close to its claimed natural shelf-life boundary without controlled atmosphere.
  7. Pre-shipment condition: Anthracnose and finger rot indicate plantation or packing-stage causes.
  8. Insufficient or improper stowage: Non-perforated plastic sheeting allegedly obstructed airflow channels.
  9. Shipper’s acts or omissions: Shipper’s load and stow terms, cargo preparation, maturity, harvest timing, and declared particulars.
  10. Post-discharge causation: Four days elapsed before survey; seals were removed; pulp temperatures reached 23.3°C; and post-discharge handling is undocumented.
  11. Failure to mitigate: Depending on when the condition was known and how quickly the bananas were sorted, ripened, marketed, or sold.
  12. Failure of proof: No reliable damaged quantity, no agreed tally, no chain of custody, and no supported market-value evidence.
  13. Concurrent causes: Any Carrier liability should be confined to the additional loss actually caused by an actionable delay, excluding natural deterioration, disease, poor stowage and post-discharge events.

The Carrier should not presently rely on unseaworthiness or due-diligence arguments because there is no evidence of vessel or reefer unseaworthiness. If such an issue is later alleged, maintenance, pre-trip inspection and power-supply records will be needed.

Limitations and time bar

Package or weight limitation

Under Hague-Visby Article IV rule 5, the ordinary ceiling is the higher of:

  • 666.67 SDR per package or unit; or
  • 2 SDR per kilogram of gross weight of the goods lost or damaged.

The waybill enumerates 27,600 boxes, so the boxes are likely to be treated as packages rather than the 23 containers, subject to the exact wording and applicability of the Rules. English authority treats accurately enumerated items within containers as the relevant packages or units. steamshipmutual.com rpclegal.com

Even if only the claimed 16,800 boxes are relevant, the package-based ceiling would be vastly higher than USD 50,400. The weight-based ceiling for the entire consignment would be:

579,764 kg×2 SDR/kg=1,159,528 SDR

579,764 kg×2 SDR/kg=1,159,528 SDR

Accordingly, Hague-Visby package or weight limitation is unlikely to reduce this relatively small claim.

If Hague-Visby does not apply compulsorily, the full standard terms may contain a lower contractual delay cap, possibly freight-based. That cannot be assessed without the incorporated terms. A distinction may also arise between:

  • limitation for physical cargo damage caused by delay; and
  • a contractual cap for pure delay loss.

One-year time bar

Hague-Visby Article III rule 6 generally discharges the Carrier from liability unless suit is brought within one year from delivery or the date when the goods should have been delivered. The one-year rule is broad and applies to “all liability whatsoever in respect of the goods.” hilldickinson.com

On the current evidence, discharge occurred on 13 July 2026, so the prudent working deadline is 13 July 2027, not 1 July 2027. If contractual delivery occurred later than discharge, the exact date must be identified, but the Carrier should not volunteer a later deadline.

Because the contract requires LMAA arbitration, the Claimant must validly commence arbitration within the applicable period. A claim letter alone does not ordinarily commence arbitration or protect time. The Carrier should:

  • make no admission about the deadline;
  • grant no extension inadvertently;
  • require any extension request to be express and agreed in writing;
  • reserve the right to contend for an earlier date; and
  • review whether the standard terms impose an additional notice requirement.

The letter dated 10 September or 4 November appears to give notice well after three days from delivery. Under Hague-Visby, failure to give timely notice ordinarily creates prima facie evidence of delivery as described rather than an absolute bar. The joint survey and Carrier attendance may in any event amount to actual notice, so this is a secondary evidential point rather than a complete defence.

Further investigations required

Voyage and delay chronology

Obtain a complete movement history for each container:

  • gate-in and laden gate-in dates;
  • harvest, packing and stuffing dates;
  • load and discharge times for every vessel;
  • arrival, berth, discharge and reload times at Puerto Banana;
  • planned and actual connections;
  • reasons for each connection change or omission;
  • feeder schedules and space availability;
  • terminal closure and reopening records;
  • port authority notices;
  • vessel statements of facts, logs and agent reports;
  • backlog allocation records; and
  • customer notifications sent specifically to We Love Bananas or A-Peeling.

The records should separate delay occurring before, during, and after Storm Gustav.

Reefer performance

Obtain:

  • full raw logger graphs, not merely the summary;
  • supply-air and return-air temperatures;
  • USDA or independent portable logger data, if any;
  • fresh-air ventilation records confirming 25 cbm/hr;
  • alarm histories and power interruption logs;
  • terminal plug-in and monitoring records;
  • pre-trip inspection certificates;
  • reefer machinery maintenance records;
  • set-point change history;
  • remote monitoring audit trail;
  • records for the final 48-hour gap in SPCU4418; and
  • an explanation for the absence of data for SPCU8230652.

Special attention should be given to SPCU8230652 because it had no logger and was the container in which finger rot was reportedly present at about 8%.

Cargo condition and preparation

Request:

  • harvest and cutting dates;
  • plantation quality-control records;
  • maturity grade and age at shipment;
  • pre-cooling records and pulp temperature at stuffing;
  • fungicide and post-harvest treatment records;
  • disease inspections and phytosanitary certificates;
  • packing specifications;
  • Banavac bag and perforation specifications;
  • stuffing plans and photographs;
  • origin survey or quality certificates;
  • ventilation calculations;
  • ethylene exposure records; and
  • evidence of the expected shelf life under the agreed ordinary-atmosphere carriage.

Post-discharge handling

Obtain:

  • terminal discharge, plug-in, alarm and gate-out records;
  • date and time seals were broken;
  • identity of the person who broke them;
  • cold-store temperatures;
  • unstuffing and survey chronology;
  • whether ripening gas was applied;
  • photographs or video before handling;
  • warehouse and transport records; and
  • the date of final sale or disposal.

Missing documentation

The Claimant should be asked to provide the following before any liability discussion:

Category Required documents
Standing Assignment, authority, sale contracts, title and risk documents
Loss Commercial invoices, actual sales, credit notes, salvage and disposal evidence
Cargo condition Origin certificates, harvest records, pre-cooling and packing records
Survey Full report, photographs, sampling sheets and container-specific minutes
Container identity Reconciliation of SPCU0001-0014 with the actual container numbers
Mitigation Sorting, ripening, sale, salvage and storage records
Insurance Policy, insurer payment evidence and subrogation documentation
Notice Original claim correspondence and explanation of conflicting dates

The Carrier should internally obtain the full waybill terms, booking communications, freight invoice, reefer logs, operational records, and all storm-related documents.

Recommended claims position

Send a reservation and document-demand response, not an admission. The response should state that:

  • A-Peeling’s standing and authority are unproven;
  • the booking dates were estimates and the revised ETA was 10 July;
  • the asserted 6-10 day delay is not accepted;
  • no in-transit temperature deviation has been established;
  • the surveys identify natural ripening, pre-existing disease and shipper stowage as alternative or concurrent causes;
  • the claimed quantity and container identities do not reconcile with the waybill and survey evidence;
  • sound and damaged values are unsupported;
  • all contractual and Hague-Visby defences, limitations, jurisdiction provisions and time bars are reserved; and
  • no act of investigation or correspondence constitutes a waiver or extension of time.

On current evidence, my liability range is:

Outcome Assessment
Full defence Realistic if weather causation, proper carriage, poor stowage and lack of claimant standing are proved
Partial exposure Possible if an avoidable missed connection materially shortened commercial life
Full USD 50,400 liability Unlikely on the existing evidence
Commercial settlement Consider only after standing and actual loss are documented, and at a substantial discount

A provisional reserve of USD 15,000-25,000 plus defence costs is reasonable. That reflects litigation risk from the long transit and physical ripening while recognising that the current claim is poorly proved and the Carrier has multiple credible defences.

 

LL2

CARGO CLAIM ASSESSMENT

Claimant: A-Peeling Traders FZE | Claim Amount: USD 50,400.00

Vessel/Voyage: MV Plantain Runner v.0625E | Waybill: SS250623

Cargo: 23 x 40ft HC Reefer Containers (27,600 boxes fresh green Cavendish bananas)

Route: Puerto Plátano, Costa Rica $\rightarrow$ Puerto Banana, Spain $\rightarrow$ Rotterdam, Netherlands

1. Executive Summary & Assessment of Liability

Carrier’s Liability Position: DEFEND (Low Risk of Carrier Liability)

The claim submitted by A-Peeling Traders FZE should be rejected or strictly defended. The cargo deterioration was primarily caused by a combination of natural inherent vice, pre-existing plantation disease, improper shipper stowage, and transit delay directly attributable to an unpreventable force majeure event (Tropical Storm GUSTAV).

The data loggers confirm that the Carrier maintained the contractual reefer temperature set-point (13.3°C) throughout the voyage with zero in-transit deviations.

2. Potential Defences & Legal Principles

  • Absence of Express Guarantee & Delay Clause: Under standard English law and Clause 3 of the Waybill, schedules/ETAs are estimates only without guarantee. The Hague-Visby Rules do not impose an absolute obligation to arrive at a specific time unless expressly guaranteed.
  • Hague-Visby Rules Article IV Rule 2 Exemptions:
    • Art. IV r.2(d) — Act of God / Perils of the Sea: Delay at the transshipment hub (Puerto Banana) was directly caused by Tropical Storm GUSTAV (sustained winds 55–70 knots, 4–6m swells, 45-vessel backlog).
    • Art. IV r.2(m) — Inherent Vice / Wastage: Cavendish bananas have a natural, finite commercial shelf life (35–40 days from harvest). When total elapsed time reached ~45 days (from origin gate-in), natural ripening is inevitable.
    • Art. IV r.2(i) — Act or Omission of the Shipper: Non-perforated nylon/plastic sheets were stowed by the shipper across the door-side T-bar floors, obstructing airflow channels and accelerating localized deterioration.
    • Art. IV r.2(p) — Latent Defects / Pre-existing Disease: Survey reports confirm anthracnose and finger rot, which are field/plantation-borne pathogens originating prior to loading.

3. Discrepancies, Quantum & Financial Exposure

Item Claimant’s View / Claim Carrier’s View / Evidence Impact on Claim
Claimed Scope USD 50,400 (USD 3.00/box across 14 containers / 16,800 boxes) Whole shipment depreciation applied arbitrarily without proper sorting Quantum is artificially inflated and unproven
Actual Tally Ripe Assessors: ~45 boxes yellow, 3 total loss Peel & Partners: ~20 boxes yellow, 1 total loss Physical loss is minimal (under USD 1,000 in actual sound value loss)
Title to Sue Claim brought by A-Peeling Traders FZE (Dubai) Waybill lists Shipper as Gran Racimo and Consignee/Notify as We Love Bananas Defective Title to Sue unless a valid endorsement/assignment is proven

4. Applicable Limitations

  • Package / Unit Limitation: Under the Hague-Visby Rules (Art. IV r.5), liability is limited to 2 SDRs per kilogram or 666.67 SDRs per package, whichever is higher.
    • 27,600 boxes = $27,600 \times 666.67\text{ SDRs} = 18,400,092\text{ SDRs}$ (far exceeds total cargo value). Limitation by weight/package will not cap this specific USD 50,400 claim below its face value, making liability defences the primary shield.
  • Time Bar: Hague-Visby Rules Art. III r.6 imposes a 1-year time limit from discharge (13 July 2026). The time bar expires on 13 July 2027 (Note: Claimant incorrectly listed 1 July 2027).

5. Missing Documentation & Required Further Investigations

Further Investigations Required:

  1. Transshipment Log Analysis: Verify exact berth arrival/departure times of MV Top Banana, MV Cavendish Queen, and MV Plantain Runner at Puerto Banana to confirm the delay was 100% weather-driven.
  2. Missing Logger Check: Investigate container SPCU8230652 where no logger data was recovered to ensure no localized mechanical failure occurred.

Documentation to Request from Claimant:

  • Proof of Title to Sue (Bill of Lading / Waybill assignment, commercial invoice, proof of payment).
  • Plantation Harvest Logs & Gate-in dates (to confirm fruit age at loading).
  • Delivery Receipts / Salvage Invoices (proving actual mitigation and realized salvage values rather than estimated depreciation).

6. Rejection Strategy

Issue a formal repudiation letter highlighting:

  1. Title to Sue: Challenge A-Peeling Traders FZE’s standing under the Non-Negotiable Sea Waybill.
  2. Duty of Care Fulfilled: Present data loggers proving flawless reefer management at 13.3°C throughout sea carriage.
  3. Exempted Causes: Cite Art. IV r.2(d) (Storm GUSTAV delay), Art. IV r.2(i) (Shipper’s improper T-bar sheet stowage), and Art. IV r.2(m)/(p) (Inherent vice and plantation-borne anthracnose/finger rot).

 

LL3

Claim Assessment — Waybill SS250623 (A-Peeling Traders FZE v Split Seas Container Line A/S)

Framework

Carriage is under a non-negotiable sea waybill, said to incorporate Hague-Visby Rules (with a separate clause also referring to “Incorporation of the Hague Rules” — this internal inconsistency needs resolving, as it affects the limitation figures and time-bar wording available to the Carrier). English law and LMAA arbitration apply.

The Claimant must first establish a prima facie case: cargo shipped in good order, discharged in bad order, and damage occurring within the period of the Carrier’s responsibility. If that is made out, the burden shifts to the Carrier to bring itself within an Article IV(2) exception and to show due diligence/no negligence in care of cargo.

Threshold issue: title to sue

Before liability is even reached, there is a real question whether A-Peeling Traders FZE has any contractual right to claim under this waybill at all:

  • The named consignee on the waybill and the “Customer” on the Booking Confirmation is We Love Bananas, Hamburg — not A-Peeling Traders.
  • A-Peeling Traders does not appear as shipper, consignee, or notify party on any shipping document in the bundle.
  • Under a non-negotiable waybill, rights of suit typically vest in the person identified as consignee (or transferred under COGSA 1992 provisions), not an unrelated third party, absent an assignment, agency relationship, or subrogation.

This should be raised as a preliminary defence. Request evidence of how A-Peeling Traders acquired the right to claim — e.g. sale contract with We Love Bananas showing A-Peeling Traders bore the loss, an assignment of rights, or an insurer’s subrogation letter.

Liability — causation is genuinely disputed

Several competing causal theories are in play, and the evidence does not clearly favour the Claimant:

  • Temperature/reefer performance: 22 of 23 data loggers show the 13.3°C set point held with no deviation for the entire voyage. The one off-power event recorded was post-discharge/pre-gate-out, outside the Carrier’s period of responsibility. This significantly undermines a “carrier failed to refrigerate properly” theory — the Claimant’s case is really about elapsed time exceeding shelf life, not a cooling failure.
  • Inherent vice: Anthracnose and finger rot are field/harvest-related fungal diseases, not conditions that develop from transit delay. Their presence supports an Article IV(2)(m) inherent vice defence for at least part of the deterioration.
  • Shipper’s stowage: Non-perforated plastic sheeting obstructing T-bar airflow was noted by the Carrier’s surveyor. Under an FCL/CY-CY, shipper’s load/stow/count shipment, this points to Article IV(2)(i)/(n) (act of shipper / insufficiency of packing) — a defence to the proportion of damage caused by localised poor airflow, though this needs corroboration on when and by whom the sheeting was placed.
  • Weather/port congestion: Tropical Storm Gustav is well-documented (independent met advisory plus the Carrier’s own operations advisory), causing terminal suspension at Puerto Banana and a stated 3–7 day knock-on delay to transshipment — broadly consistent with the ~3-day slippage against the already-amended schedule (revised ETA 10 July vs actual 13 July). This supports an Article IV(2)(c)/(d) perils of the sea/act of God argument for the transshipment-leg delay, reinforced by the contractual “estimates only, no guarantee” clause.
  • Caution: the Carrier still carries the burden of showing due diligence and that the excepted peril was the effective cause — it should not rely solely on the “no liability for delay” clause without addressing whether any part of the overall 38–45 day transit was attributable to its own routing/scheduling choices rather than the storm.

Overall view: The Carrier has a reasonably strong package of defences (temperature integrity, inherent vice, shipper’s stowage fault, weather) that between them could displace most or all of the alleged causal link to “delay” as such. Liability is unlikely to be clean or total, but a nil finding is not guaranteed either — this is a multi-causal case that will likely resolve on apportionment rather than a single knockout point (subject to the title-to-sue issue above, which could dispose of the claim entirely).

Quantum — currently weak

  • The joint tally exercise recorded only ~45–48 boxes as damaged/total loss out of 27,600 boxes shipped, yet the claim applies a flat USD 3.00/box notional depreciation across 16,800 boxes (only 14 of the 23 containers) — a “loss of shelf life” methodology untethered from the physically inspected damage.
  • No explanation is given for why only 14 of the 23 containers are included in the claim, or what happened to the other 9.
  • No resale invoices or sale-contract evidence support either the USD 19.75 sound value or USD 16.75 “salvage value” per box — these should be tested against actual market/resale documentation, not accepted as surveyor estimates.

This is an area where quantum should be pushed back hard even if some liability is conceded.

Missing documentation / further investigation

  1. Full carrier’s standard bill of lading terms referenced on the waybill (to resolve the Hague/Hague-Visby clause paramount conflict and confirm notice/time-bar wording).
  2. Evidence of A-Peeling Traders’ title to sue (contract with We Love Bananas, assignment, or subrogation).
  3. Pre-shipment condition documentation: phytosanitary certificate, quality/condition certificate at origin, and critically the harvest date (shelf life runs from harvest, not from loading — currently only the loading date is known).
  4. Full statement of facts/vessel logs for all three legs to reconcile actual dates against the booking amendment and the storm timeline.
  5. Container stuffing report and photographs — particularly to establish when and by whom the non-perforated plastic sheeting was installed.
  6. Recovery attempt and explanation for the missing data logger on SPCU8230652, and full graphs (not just summaries) for the two “partial” loggers.
  7. Explanation for why only 14 of 23 containers are the subject of the claim.
  8. Underlying sale contract(s) and resale invoices to substantiate sound/salvage values claimed.
  9. Independent phytopathology opinion on typical incubation periods for anthracnose/finger rot, to assess pre-shipment origin.
  10. Confirmation of the actual date suit must be brought — see below.

Time bar and notice

  • Discharge occurred 13 July 2026. Under the one-year suit period (Art III r.6), time would be expected to run to on or about 13 July 2027, not “1 July 2027” as asserted in the Letter of Claim — this discrepancy should be queried, and the Carrier should calendar its own date rather than relying on the Claimant’s figure.
  • Note that under an LMAA arbitration clause, “suit” generally means the claim must be commenced (arbitrator appointed) within the period — correspondence alone will not stop time running. Any extension should be recorded in writing.
  • Worth checking whether written notice of damage was given within the contractual/Hague-Visby window (before or within 3 days of removal) — the joint survey took place 4 days post-discharge, which could engage the presumption of good delivery absent survey evidence to rebut it.

Document inconsistencies to flag with instructing parties

  • The case narrative refers to shipment “to Türkiye,” while every shipping document consistently shows Rotterdam, Netherlands as the discharge port — needs clarification.
  • The Carrier’s own port advisory references delays to “Eastern Mediterranean, including Port Muzhaven” services, and the surveyor’s report reference number includes “MUZ” — apparently unconnected to this Rotterdam-bound shipment; worth confirming this isn’t misfiled/cross-contaminated correspondence.
  • The Letter of Claim is headed “4 November 2026” but signed off “Date: 10 September 2026” — an internal date inconsistency relevant to notice timing and should be clarified with the Claimant.

Limitation of liability

Because the waybill enumerates 27,600 boxes as the “said to contain” quantity, Article IV(5)(c) would likely require treating each box (not each container) as the relevant package for limitation purposes. At roughly USD 3/box claimed, this sits well under the per-package SDR 666.67 limit, so package limitation is unlikely to reduce exposure below the sums realistically in dispute — it should be pleaded to preserve rights, but is not likely to be commercially decisive here.

This is a preliminary claims-handling assessment based on the documents provided; the delay-exclusion-clause interaction with Article III(8), and the apportionment between excepted perils, would benefit from formal input from English law/Hague-Visby counsel before any liability position is communicated to the Claimant.

 

LL4

Assessment of Claim under Waybill SS250623 (A-Peeling Traders FZE v Split Seas Container Line A/S)

Summary of Claim

Claimant (A-Peeling Traders FZE, Dubai) seeks USD 50,400 for alleged deterioration of 23 × 40ft HC reefer containers of fresh green Cavendish bananas (SUNNY SPLIT brand, ~27,600 boxes, ~579,764 kg) shipped CY/CY under Non-Negotiable Sea Waybill SS250623 from Puerto Plátano, Costa Rica (loaded ~6 June 2026 on MV TOP BANANA) via Puerto Banana, Spain, to Rotterdam (discharged 13 July 2026 on feeder MV PLANTAIN RUNNER).

Claimant alleges transit delay (claimed 6–10 days beyond estimated 7–10 July ETA; total sea transit ~38 days from load; overall elapsed ~45 days from empty gate-in) caused premature ripening, softening, and quality loss exceeding the recognised ~35–40 day shelf life from harvest. Joint survey 17 July 2026 (4 days post-discharge) noted ~35% beginning of ripening, softening in 8–17% (parties disagree), plus traces of anthracnose and finger rot. Claim calculation uses a uniform ~USD 3/box depreciation on 16,800 boxes (sound value USD 19.75 → salvage USD 16.75).

Waybill incorporates Hague-Visby Rules (HVR), English law, LMAA arbitration (London). Times are estimates only, without guarantee; Carrier may substitute vessels/alter routing; Shipper’s load/stow/weight/count; particulars as declared by Shipper without Carrier responsibility.

Liability Assessment

Primary position: Deny liability (or admit only on a heavily qualified/nil basis pending further evidence). The claim is framed as pure delay damage to a perishable cargo. Under the HVR (applicable via the waybill):

  • Carrier’s core obligations are to exercise due diligence to make the ship seaworthy and to properly and carefully load, handle, stow, carry, keep, care for, and discharge the goods (Arts. III.1–2). There is no free-standing obligation to deliver by a particular date.
  • Liability is for loss of or damage to goods arising from failure to care for them, subject to the Art. IV.2 exceptions (including (c) perils of the sea, (m) inherent vice/quality/defect, (n) insufficiency of packing, (i) act or omission of shipper, (q) any other cause without actual fault/privity of Carrier or its agents).
  • The waybill and booking expressly disclaim liability for delay and state that all ETAs/ETDs are estimates only, without guarantee. Booking Amendment No. 1 further adjusted times (still estimates). English law generally upholds such clear contractual disclaimers of liability for pure delay (subject to HVR mandatory regime for cargo damage).

Evidence on causation is weak and contested for Claimant:

  • Reefer data-loggers (22/23 containers) confirm set-point 13.3°C maintained throughout with no in-transit deviations. One container had no logger recovered; one off-power event was post-discharge/pre-gate-out (outside Carrier’s period of responsibility). Pulp temperatures at survey (13.7–23.3°C) are consistent with post-discharge warming.
  • Carrier’s surveyor (Peel & Partners) attributes condition to: (a) pre-shipment/garden conditions (anthracnose and finger rot are pathological and plantation-origin); (b) inherent nature/limited shelf life of green Cavendish bananas; (c) shipper stowage deficiency (non-perforated nylon/plastic sheets obstructing T-bar floor air channels in several containers, impeding airflow and risking uneven cooling); (d) transit duration at the upper end of the 35–40 day window (marginal contribution only). Carrier’s surveyor recorded far lower damaged quantities (~20 yellow boxes + 1 total loss vs Claimant’s higher figures) and declined to sign joint minutes.
  • Claimant’s surveyor (Ripe Assessors) asserts delay as the cause and estimates ~USD 3/box depreciation across the whole, but provides limited quantification support and notes seals already removed pre-survey.
  • Tropical Storm GUSTAV (late June 2026) directly affected Puerto Banana/Strait of Gibraltar approaches (gale/heavy-swell warnings, terminal suspension ~25–29/30 June, significant vessel backlog). Carrier issued a timely congestion/weather advisory. This is a classic Art. IV.2(c) peril of the sea / circumstance beyond Carrier’s reasonable control. The delay appears largely attributable to weather-related disruption at the transhipment hub rather than Carrier fault.

Overall transit (~38 days sea) sat at the outer edge of recognised shelf life. Even without weather, marginal overruns can occur with transhipment and weather routing; the contractual estimates carried no guarantee. Shipper’s load/stow and declared particulars further limit Carrier exposure.

On current evidence, Claimant has not established that any delay attributable to Carrier fault (rather than weather, inherent vice, or shipper stowage) was the effective cause of the observed condition. Quantum is also disputed (quantity of damage and valuation methodology).

Potential Defences

  1. Contractual disclaimer of liability for delay + estimates-only language (waybill + booking). Strong under English law for pure delay claims.
  2. HVR Art. IV.2 exceptions:
    • (c) Perils of the sea / Act of God (Tropical Storm GUSTAV and consequent port congestion/backlog at Puerto Banana).
    • (m) Inherent vice/quality of the goods (limited shelf life of green Cavendish bananas; natural ripening tendency).
    • (i)/(n) Act/omission of shipper or insufficiency of packing/stowage (non-perforated sheets obstructing T-bar airflow; shipper’s load/stow clause).
    • (q) Catch-all (no actual fault/privity of Carrier).
  3. No temperature failure: Data-loggers and survey temperatures support proper care during Carrier’s period of responsibility.
  4. Causation/quantum: Pre-existing disease (anthracnose/finger rot), post-discharge warming, seals removed pre-survey, disagreement on damaged quantity, and Claimant’s uniform per-box depreciation lack robust support. Carrier surveyor assesses carrier-attributable loss at USD 0.
  5. Title/standing: Claim brought by A-Peeling Traders FZE (Dubai trader) rather than the named consignee (We Love Bananas, Hamburg) or shipper. Clarify chain of title, assignment, or agency. Sea waybill is non-negotiable.
  6. Limitation: Package/unit limitation under HVR Art. IV.5 (if any liability found) would likely apply; Claimant’s calculation appears to ignore it. Time bar noted by Claimant as 1 July 2027 (HVR 1-year from delivery is usual; confirm exact delivery/discharge date and any extensions).

Weather does not automatically exonerate if Carrier failed to exercise due diligence or care, but here the disruption was systemic (terminal suspension + backlog of ~45 vessels) and Carrier issued customer advisories. No evidence of unreasonable deviation or failure to mitigate.

Missing Documentation / Further Investigations Required

Immediate requests from Claimant (and/or consignee/shipper):

  • Full chain of title / proof of interest (commercial invoice, sale contract, payment evidence, any assignment from We Love Bananas or Gran Racimo Plantations).
  • Pre-shipment documents: packing list, quality certificates, phytosanitary certificates, harvest/packing dates, pulp temperatures and condition at stuffing, any pre-shipment surveys or lab reports on disease incidence.
  • Full survey photographs, temperature logs at unstuffing, and detailed tally sheets (joint and unilateral).
  • Evidence supporting the claimed sound/salvage values and the specific 16,800-box subset used in the calculation.
  • Any notice of claim or LOU history; details of mitigation/sale of the cargo.
  • Explanation for why Claimant (rather than named consignee) is pursuing.

Internal / Carrier investigations:

  • Full voyage reports, master’s/deck logs, and transhipment records for all three legs (especially Puerto Banana dwell time, berthing delays, and any weather routing decisions around GUSTAV).
  • Complete reefer monitoring data (full graphs for all 23 containers, including the missing logger for SPCU8230652 and the partial for SPCU4418). Confirm logger fitting/recovery procedures.
  • Terminal records at Puerto Banana and Rotterdam (gate-in/out, power supply, any off-power events, unstuffing dates).
  • Stowage plans / photographs or shipper packing declarations confirming the nylon-sheet placement.
  • Any prior claims history or similar banana shipments on these services for comparative shelf-life performance.
  • Confirmation of exact discharge and delivery dates for time-bar calculation.

Expert evidence (if claim progresses): Independent reefer/banana specialist on (i) expected shelf life under the declared carriage conditions (13.3°C / 25 cbm/hr vent), (ii) significance of anthracnose/finger rot as pre-shipment, (iii) impact of the observed stowage obstruction, and (iv) whether the recorded transit time alone would produce the observed condition absent other factors.

Quantum and Commercial Position

Even if some liability were established, quantum is heavily contested. Claimant’s USD 50,400 assumes uniform depreciation across a large portion of the shipment and ignores limitation. Carrier surveyor’s assessment is effectively nil. Salvage/mitigation evidence is thin. Any settlement discussions should be without prejudice, low-value, and conditional on full release, given the strong defences.

Recommended Next Steps

  1. Acknowledge claim and reserve all rights (including time bar and jurisdiction).
  2. Request the missing documents listed above and full survey materials.
  3. Instruct further investigation of voyage/weather/reefer records.
  4. Maintain denial of liability pending satisfactory evidence of Carrier fault causation.
  5. If Claimant presses, prepare detailed defence submission for LMAA arbitration highlighting HVR exceptions, contractual delay disclaimer, data-logger evidence, stowage issues, and weather.

The claim appears weak on both liability and quantum on the material presently available. Weather disruption at the transhipment hub provides a clear and documented defence under the HVR and the contract terms.

LL5 

Below is a full claims‑handler style assessment based entirely on the uploaded documents. I cite the documents where relevant, quoting 1–2 lines where required.

Liability Assessment — Summary Position

The evidence presently does not establish carrier liability under the Hague‑Visby Rules. The cargo was delivered with signs of ripening, but:

  • No temperature deviations occurred during the carrier’s period of responsibility (22/23 containers recorded stable temperatures at 13.3°C; one container had no logger) — “No in‑transit temperature deviations… were recorded” (Reefer Data‑Logger Summary).
  • Delay appears attributable to Tropical Storm Gustav, a recognised “act of God” defence under Hague‑Visby Article IV Rule 2(c).
  • Shipper‑caused stowage defects (non‑perforated nylon sheets blocking airflow) were identified — “This constitutes an inadequacy in the shipper’s stowage” (Carrier’s Surveyor Report).
  • Pre‑shipment disease (anthracnose, finger rot) was present — “indicates pre‑existing pathological conditions originating in the plantation” (Carrier’s Surveyor Report).
  • Ripening is inherent vice of bananas (HVR Art IV r.2(m)).

On the present record, the carrier has multiple strong defences.

1. Nature and Extent of Delay

The ETA was expressly non‑guaranteed:

  • Waybill: “All arrival… times are estimates only, given without guarantee.”
  • Booking: “THE CARRIER ACCEPTS NO LIABILITY FOR DELAY.”

The actual discharge was 13 July 2026, compared with an indicative ETA of 7–10 July. The delay is therefore 3–6 days, not 6–10 days as claimed.

The documents show that Tropical Storm Gustav caused port closure and congestion at Puerto Banana:

  • “Terminal operations… suspended on 25 June… phased resumption from 30 June… customers should expect delays of 3–7 days.” (Carrier Advisory)
  • Meteorological Advisory: “Port operations… expected to return to normal by 30 June – 1 July… backlog of approximately 45 vessels.”

This is a classic weather / port congestion defence under Hague‑Visby Rules Art IV r.2(c) and (j).

2. Condition of Cargo

Both surveyors agree on ripening and softening, but disagree on quantity.

Claimant’s surveyor (Ripe Assessors)

  • 35–40% beginning to ripen
  • 10–20% softening
  • 45 yellow boxes + 3 total loss
  • Cause: delay exceeding shelf life
  • Loss: USD 3/box depreciation across entire shipment

Carrier’s surveyor (Peel & Partners)

  • 35% ripening
  • 8–17% softening
  • 20 yellow boxes + 1 total loss
  • Additional findings:
    • Shipper stowage defect (non‑perforated nylon sheets blocking airflow)
    • Pre‑shipment disease (anthracnose, finger rot)
    • No temperature deviations
    • Damage extent ~17%
    • Financial loss attributable to carrier: USD 0

The carrier’s surveyor refused to sign the joint minutes due to methodology concerns.

3. Causation Analysis

Under Hague‑Visby Rules, the claimant must prove damage + causation + carrier fault.

Evidence against carrier fault:

  • Temperature logs show perfect performance (22/23 containers).
  • One off‑power event occurred after discharge, outside carrier responsibility.
  • Ripening is inherent vice of bananas (HVR Art IV r.2(m)).
  • Transit time (38 days) is within the accepted shelf‑life window (35–40 days).
  • Delay caused by tropical storm is an Article IV defence.
  • Shipper stowage defect contributed to uneven cooling.

Evidence supporting claimant:

  • Transit exceeded the commercial shelf‑life when measured from gate‑in (45 days).
  • Ripening consistent with prolonged transit.

However, gate‑in to unpacking is not the carrier’s period of responsibility under Hague‑Visby Rules.

4. Defences Available to the Carrier

(a) Act of God / Perils of the Sea — HVR Art IV r.2(c)

Tropical Storm Gustav caused:

  • port closure
  • berthing restrictions
  • 45‑vessel backlog
  • 3–7 day delays

This is a strong defence.

(b) Port Congestion — HVR Art IV r.2(j)

Congestion is explicitly mentioned in the carrier’s advisory.

(c) Inherent Vice — HVR Art IV r.2(m)

Bananas naturally ripen. The claimant’s own surveyor notes shelf‑life limitations.

(d) Shipper’s Fault — HVR Art IV r.2(n)

Non‑perforated nylon sheets obstructing airflow constitute improper stowage.

(e) Pre‑shipment Defect — HVR Art IV r.2(a)

Anthracnose and finger rot originate in the plantation.

(f) No Temperature Deviation

The strongest factual defence.

(g) Contractual Exclusion of Delay Liability

Both the waybill and booking terms exclude liability for delay.

5. Missing Documentation / Further Investigation Required

To fully close the file, request:

  • Full data‑logger graphs (only summary provided).
  • Harvest date / packing date from shipper (to confirm shelf‑life).
  • Evidence of stowage method (photos of nylon sheets).
  • Terminal logs from Puerto Banana confirming storm‑related closure.
  • Carrier’s internal vessel logs for all three legs.
  • Proof of salvage sale (claimant provides only valuation, not evidence of sale).
  • Temperature records for the one container without a logger (SPCU8230652).
  • Pre‑shipment inspection certificates from Gran Racimo Plantations.

These will strengthen the carrier’s position.

6. Quantum Assessment

The claimant’s calculation is simplistic:

  • They apply USD 3 depreciation per box to all 16,800 boxes, despite only 45–60 boxes being yellow/damaged according to surveys.
  • No evidence of market price, no invoices, no sales contracts, no salvage receipts.

The claim is not substantiated.

7. Time Bar

The claimant notes time bar expires 1 July 2027.

The claim was submitted 10 September 2026, so it is timely.

8. Recommended Carrier Position

Primary position

Deny liability. Reasons:

  • Delay caused by Tropical Storm Gustav (HVR defence).
  • Contractual exclusion of delay liability.
  • No temperature deviation.
  • Shipper stowage defect.
  • Inherent vice.
  • Pre‑shipment disease.
  • Quantum unsupported.

Secondary (commercial) position

If settlement is commercially desirable, offer a nuisance‑value settlement (e.g., USD 5,000–10,000) without admission of liability, referencing:

  • disputed survey results
  • minimal damaged quantity
  • shared causation factors

9. Conclusion

Based on the documents, the carrier has strong legal and factual defences. The claim is weak on causation, weak on quantum, and contradicted by objective temperature data. Liability should be formally denied, subject to obtaining the missing documents listed above.

If you want, I can draft a formal liability denial letter, a reservation of rights, or a request for further documents.

Inspired by our work?

Let's collaborate to elevate your brand. Contact Us today!

Other News

Case study: Harnessing AI for maritime integrity

Editor’s Comment: Unapproved AI on board

Stay in the loop